33KV Power Transmission Line From Abdullahpur Substation to Booster Pump Station, Keranigonj

Investor Name: Chinese government Published Date: 25 September 2012 Location: Jashaldia point of Munshiganj Value: 407,000,000 $ Employer : Dhaka WASA and M/S. CAMC Engineering Co. Ltd. Architecture: Aridod ABOUT PROJECT A commercial contract was signed between Dhaka WASA and M/S. CAMC Engineering Co. Ltd. for constructing a 450 MLD capacity surface water treatment plant at Jashaldia…

33KV Power Transmission Line From Mirkadim Substation to Jashaldia Padma Water Treatment Plant

Investor Name: Chinese government Published Date: 25 September 2012 Location: Jashaldia point of Munshiganj Value: 407,000,000 $ Employer : Dhaka WASA and M/S. CAMC Engineering Co. Ltd. Architecture: Aridod ABOUT PROJECT A commercial contract was signed between Dhaka WASA and M/S. CAMC Engineering Co. Ltd. for constructing a 450 MLD capacity surface water treatment plant at Jashaldia…

Captive Power Station Projects

Investor Name: Dhaka WASA Published Date: 2012 Location: Lalbagh Water Works, Dhaka & Goodnail Water Treatment, Plant, Narayangonj Value: 120 Billion BDT Employer : Dhaka WASA Architecture: MAK Consortium ABOUT PROJECT Role of ARIDOD Tech Serve Limited: 1. Import & supply of gas generators 2. Design & construction of generator shed at different pump houses. 3.…

Telecommunication Projects with Banglalink and Citycell

Investor Name: Banglalink & Citycell Published Date: 2014 Value: N/A Employer : Banglalink & Citycell Architecture: ARIDOD ABOUT PROJECT Building construction along with site aquisition, Power connection, Electrification work, Plumbing works and other works of 04 BTS sites Ericsson for Banglalink Project Building construction along with site aquisition, Power connection, Electrification work, Plumbing works and…

Supply, Installation, Testing & Commissioning of 1152 KVA Generator to Dhaka Wasa

Investor Name: ENERGYPAC Published Date: 2013 Location: Lalbagh Water Works, Dhaka & Goodnail Water Treatment, Plant, Narayangonj Value: 120 Billion BDT Employer : Dhaka WASA Architecture: MAK Consortium ABOUT PROJECT Role of ARIDOD Tech Serve Limited: 1. Complete Power Plants 2. Complete Automatic Synchronization 3. Grid Synchronization 4. Silencer and Exhaush Flexible Connections 5. Complete Cooling…

Ligiting and other Electrical facilities of Inland Container River Terminal (ICT) at Pangao, BIWTA, Dhaka.

Investor Name: BIWTA & CPA Published Date: 2013 Location: Keraniganj, Dhaka Value: 1.54 Billion BDT Employer : Bangladesh Inland Water Transport Authority (BIWTA) Architecture: MAK Consortium ABOUT PROJECT Bangladesh Inland Water Transport Authority (BIWTA) and the Chittagong Port Authority (CPA) jointly built this inland terminal at a cost of Tk1.54bn. The terminal is expected to play…

Commissioning Led Giant Screen With Score Board (EDB) at Sher-a-Bangla Cricket Stadium, Mirpur.

Investor Name: Bangladesh Government, Dhaka North City Corporation Published Date: December 2015 Location: Mirpur Value: 2.2 Million USD Employer : Bangladesh Cricket Board (BCB) Architecture: MAK Consortium ABOUT PROJECT Role of ARIDOD Tech Serve Limited: 1. Tri-Vision sight screen. 2. CCTV & PA system of Shere-E-Bangla National Cricket Stadium at Mirpur.” For ICC World Cup 2011…

Beximco and TBEA 200MWP Solar Farm Power Station Project

Investor Name: Bangladesh Power Development Board (BPDB)` Published Date: December 2022 Location: Gaibandha Value: 386.79 Million USD Employer : Bangladesh Power Development Board(BPDB) Architecture: Aridod ABOUT PROJECT Teesta Solar Limited (TSL), a joint venture of Bangladesh’s Beximco Power Company Ltd and China’s TBEA Xinjiang Sunoasis Co Ltd has signed a power purchase agreement (PPA) with Power…